|
Tailplane TP2 alignment
|
|
Tailplane TP2 alignment
TP2 halves aligned for sleeve bonding: 2002 02 08.
Canon AV-1, Fujichrome Velvia 50.
The TP5 & TP6 sleeves, inside their BID tubes, are being bonded into the TP2 foam pieces. Careful measurments were taken in several directions to ensure symmetry before leaving to cure.
This page last updated 2012-12-12.
I try to make this page as accessible as possible,
by adhering to HTML 4 standards.
|
|
|
I welcome comments on this website. However, because of the
amount of spam it attracts, I no longer post a direct e-mail
address on any page. Instead, please
click here to contact me.
You will have to confirm that you are human before the message
will be sent on to me.
|