![]() |
Main and sub-panel powered up |
![]() |
|
![]() |
Navigation & Acknowledgements |
3 pictures on this page - scroll down to see the rest
main panel powered up: 2021-01-31 Panasonic DMC-FT1
The main instrument panel running, with an external PSU in place of the battery. Now that I have commoned the battery and engine earths, the MGL TP-3 in the middle of the sub-panel is lighting up. Also working are the Dynon D2 and Airbox Aware, although neither is getting much of a GPS signal inside the garage.
main panel powered up: 2021-01-31 Panasonic DMC-FT1
The main instrument panel running, with an external PSU in place of the battery. Despite being inside, the Dynon D2 has managed to find enough of a GPS signal to erect the artificial horizon.
sub-panel powered up: 2021-01-31 Panasonic DMC-FT1
The MGL instruments E-3 (left), TP-3 (centre) and BAT-1 (right) powered up. BAT-1 is already giving a sensible reading. E-3 & TP-3 will both need some configuration before showing useful readings.
![]() |
![]() ![]() |
go to next picture page![]() |
![]() ![]() |
||
Return to Rowland's home page |
This page last updated 2021-03-03. I try to make this page as accessible as possible, by adhering to HTML 4 standards. |
![]() |
![]() |
I welcome comments on this website. However, because of the amount of spam it attracts, I no longer post a direct e-mail address on any page. Instead, please click here to contact me. You will have to confirm that you are human before the message will be sent on to me. |